| United States-English |
|
|
|
![]() |
HP 3000 MPE/iX Release 6.0 System Software Maintenance Manual (Release C.60.00): HP 3000 MPE/iX Computer Systems > Chapter 2 Task ChecklistsChecklist D. Add-on with Tape |
|
Use this task checklist if your source material is on tape and you are using a CSLT tape to:
Print a copy of this checklist for each system that you are applying add-on products to. Read and perform the steps only in the following sections: Begin Preparation Tasks. Does not require exclusive access to the system.
Preparation Tasks completed. Schedule downtime for exclusive access. Begin Exclusive Access Tasks.
Checklist D tasks completed. If you have Reactive patches to apply, proceed to one of these checklists:
Record system change:
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||