Jump to content United States-English
HP.com Home Products and Services Support and Drivers Solutions How to Buy
» Contact HP
More options
HP.com home
HP XC System Software: Installation Guide > Chapter 1 Preparing for a New Installation

Task 4: Prepare the Hardware

» 

Technical documentation

Complete book in PDF
» Feedback
Content starts here

 » Table of Contents

 » Glossary

 » Index

Use the information in the HP XC Hardware Preparation Guide to prepare the hardware. The connection of nodes to ProCurve switch ports is important for the automatic discovery process. The HP XC Hardware Preparation Guide describes these connections in detail.

Do not proceed with the software installation process until all hardware preparation tasks are complete.

IMPORTANT: The only exception to preparing hardware in advance of the installation is if the hardware configuration contains HP server blades and enclosures. Setting the Onboard Administrator password and making BIOS settings on the client server blade nodes cannot be done until the switches have been discovered, a task that is documented as part of the installation process.

The installation instructions in this document assumes that all enclosures have been physically set up and populated with nodes, all components have been cabled together as described in the HP XC Hardware Preparation Guide, and you have prepared the head node and the non-blade server nodes according to the instructions in the HP XC Hardware Preparation Guide.

You are instructed at the appropriate place in this document to go to the HP XC Hardware Preparation Guide and set the Onboard Administrator password and make BIOS settings on the server blade nodes.

Printable version
Privacy statement Using this site means you accept its terms Feedback to webmaster
© 2003 Hewlett-Packard Development Company, L.P.