| Computer room |
| No. | Area or condition | Yes | No | |
| 1. | Is there a completed floor plan? | | | |
| 2. | Is there adequate space for maintenance needs? Front
42 in (106 cm) min., 48 in (121 cm) recommended. Rear 32 in (81
cm) min., 36 in (91cm) recommended | | | |
| 3. | Is access to the site or computer room restricted? | | | |
| 4. | Is the computer room structurally complete? Expected
date of completion? | | | |
| 5. | Is a raised floor installed and in good condition? What
is the floor to ceiling height? [7.5 ft (228 cm) minimum] | | | |
| 6. | Is the raised floor adequate for equipment loading? | | | |
| 7. | Are there channels or cutouts for cable routing? | | | |
| 8. | Is there a remote console telephone line available
with an RJ11 jack? | | | |
| 9. | Is a telephone line available? | | | |
9a. | Is the customer aware of the iCOD email requirements? Each
bootable partition requires a connection to the internet to send
email to notify Hewlett-Packard that the customer has allocated
additional CPUs beyond the amount initially purchased. Each bootable
partition must be configured to perform this operation. For
more details, go to http://superdome.hp.com and click on the iCOD
link. | | | |
| 10. | Are customer supplied peripheral and LAN cables
available and of the proper type? | | | |
11. | Are floor tiles in good condition and
properly braced? | | | |
12. | Metallic particulate test required. | | | |
| Power and lighting |
| No. | Area or condition | Yes | No | |
| 13. | Are lighting levels adequate for maintenance? | | | |
| 14. | Are there ac outlets available for servicing needs?
(i.e. vacuuming) | | | |
| 15. | Does the input voltage correspond to equipment specifications? | | | |
15A | Is dual source power used? If so, identify
type(s) and evaluate grounding. | | | |
| 16 | Does the input frequency correspond to equipment
specifications? | | | |
| 17. | Are lightning arrestors installed inside the building? | | | |
| 18. | Is power conditioning equipment installed? | | | |
| 19. | Is there a dedicated branch circuit for equipment? | | | |
| 20. | Is the dedicated branch circuit less than 250 feet
(72.5 meters)? | | | |
| 21. | Are the input circuit breakers adequate for equipment
loads? | | | |
| Safety |
| No. | Area or condition | Yes | No | |
| 22. | Is there an emergency power shut-off switch? | | | |
| 23. | Is there a telephone available for emergency purposes? | | | |
| 24. | Is there a fire protection system in the computer
room? | | | |
| 25. | Is antistatic flooring installed? | | | |
| 26. | Are there any equipment servicing hazards (loose
ground wires, poor lighting, etc.)? | | | |
| Cooling |
| No. | Area or condition | Yes | No | |
| 27. | Can cooling be maintained between 68° and
86°
(20° and 30° C)? | | | |
| 28. | Can temperature changes be held to 9°
(5 ° C) per hour? | | | |
| 29. | Can humidity level be maintained between 40% and
55%? | | | |
| 30. | Are air conditioning filters installed and
clean? | | | |
| Storage |
| No. | Area or condition | Yes | No | |
| 31. | Are cabinets available for tape and disc media? | | | |
| 32. | Is shelving available for documentation? | | | |
| Training |
No. | Area or Condition | | | |
33 | Are personnel enrolled in the System Administrator's
Course? | | | |
34 | Is on-site training required? | | | |