User Guide hp Integrity Superdomehp 9000 Superdome > Chapter 5 Site PreparationFacility Guidelines |
|
This section describes facility characteristics and provides guidelines for preparing the computer room.
This section contains information about facility characteristics that must be considered for the installation or operation of a Superdome server. Facility characteristics are:
The computer room floor must be able to support the total weight of the installed computer system as well as the weight of the individual cabinets as they are moved into position. Floor loading is usually not an issue in non-raised-floor installations. The information presented in this section is directed toward raised-floor installations.
Raised-floor loading is a function of the manufacturer’s load specification and the positioning of the equipment relative to the raised-floor grid. While Hewlett-Packard cannot assume responsibility for determining the suitability of a particular raised-floor system, information and illustrations are provided for the customer or local agencies to determine installation requirements. The following guidelines are recommended:
Table 5-3 “Floor-Loading Terms” defines floor-loading terms. Table 5-3 Floor-Loading Terms
The average floor load value, defined in Table 5-4 “Tate Series 800 Raised-Floor Tile Specifications”, is not appropriate for addressing raised-floor ratings at the floor grid spacing level. However, it is useful for determining floor-loading at the building level, such as the area of solid floor or span of raised-floor tiles covered by the Superdome server footprint. This section contains an example of a computer room raised-floor system that is satisfactory for the installation of a Superdome server. Based on specific information provided by Hewlett-Packard, Tate Access Floors has approved its Series 800 all-steel access floor with bolt-together stringers and 24 in. (61.0 cm) by 24 in. (61.0 cm) floor panels. Due to the large amount of floor panel material that must be removed for the purpose of routing cables, this particular floor must be braced as shown in Figure 5-6 “Tate Series 800 Floor Bracing”. In the event that the flooring is being replaced or a new floor is being installed, Tate Access Floors recommends its Series 1250 all-steel access floor with bolt-together stringers and 24 in. (61.0 cm) by 24 in. (61.0 cm) floor panels be used to support the Superdome installation.
Table 5-4 “Tate Series 800 Raised-Floor Tile Specifications” lists specifications for the Tate Access Floors Series 800 raised-floor system. Table 5-4 Tate Series 800 Raised-Floor Tile Specifications
This section contains information about space requirements for a Superdome server. This data should be used as the basic guideline for space plan developments. Other factors, such as airflow, lighting, and equipment space requirements, must also be considered. There should be enough clearance to move equipment safely from the receiving area to the computer room. Permanent obstructions, such as pillars or narrow doorways, can cause equipment damage. Delivery plans should include the possible removal of walls or doors. The physical dimensions for applicable computers and peripheral equipment are summarized in Appendix A. Other factors must be considered along with the basic equipment dimensions. Reduced airflow around equipment causes overheating, which can lead to equipment failure. Therefore, the location and orientation of air conditioning ducts, as well as airflow direction, are important. Obstructions to equipment intake or exhaust airflow must be eliminated. The location of lighting fixtures and utility outlets affects servicing operations. Plan equipment layout to take advantage of lighting and utility outlets. Do not forget to include clearance for opening and closing equipment doors. Clearance around and above the cabinets must be provided for proper cooling airflow through the equipment. The service area space requirements, outlined in Appendix C, are minimum dimensions. If other equipment is located so that it exhausts heated air near the cooling air intakes of the computer system cabinets, larger space requirements are needed to keep ambient air intake to the computer system cabinets within the specified temperature and humidity ranges. Space planning should also include the possible addition of equipment or other changes in space requirements. Equipment layout plans should also include provisions for the following:
The floor plan grid is used to plan the location of equipment in the computer room. In addition to its use for planning, the floor plan grid should also be used when planning the locations of the following items:
Copies of the floor plan grid are located in Appendix C. Equipment footprint templates are provided in Appendix C to show basic equipment dimensions and space requirements for servicing. Be sure to use the appropriate templates for the equipment that is to be installed. The service areas shown on the template drawings are lightly shaded. Removable copies of the equipment footprint templates are located in Appendix C. They should be used with the floor plan grid to define the location of the equipment that will be installed in your computer room.
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||