Jump to content United States-English
HP.com Home Products and Services Support and Drivers Solutions How to Buy
» Contact HP
More options
HP.com home
Site Preparation Guidehp Integrity Superdome andhp 9000 Superdome > Chapter 6 Pre-Installation Survey

Site Inspection

» 

Technical documentation

Complete book in PDF
» Feedback
Content starts here

 » Table of Contents

 » Index

Table 6-1 “Customer and Hewlett-Packard Information” contains a sample of the Customer and Hewlett-Packard information required.

Table 6-2 “Site Inspection Checklist” contains a sample site inspection checklist.

IMPORTANT: Ensure that the customer is aware of the iCOD email requirements. That is, each bootable partition requires a connection to the internet to send email to notify Hewlett-Packard that the customer has allocated additional CPUs beyond the amount initially purchased. Each bootable partition must be configured to perform this operation.
NOTE: Table 6-1 “Customer and Hewlett-Packard Information” and Table 6-2 “Site Inspection Checklist” are provided as examples only. To ensure use of the current information specific to your site preparation, refer to the Site Readiness Review Section of the Deployment Manager’s Handbook.

Table 6-1 Customer and Hewlett-Packard Information

Customer Information
Name:Phone No:
Street Address:City
or
Town:
State or Province:Country
Zip or postal code: 
Primary customer contact:Phone No.:
Secondary customer contact:Phone No.:
Traffic coordinator:Phone No.:
Hewlett-Packard information
Sales representativeOrder No:
Representative making surveyDate:
Scheduled delivery date 

 

NOTE: To ensure compliance with item 10 of Table 6-2 “Site Inspection Checklist”, provide a copy of Appendix D to the customer to use a worksheet to identify required names and addresses for the LAN.

Table 6-2 Site Inspection Checklist

Please check either Yes or No. If No, include comment or dateComment or Date
  

Computer room
No.Area or conditionYesNo

1.Is there a completed floor plan?  

2.Is there adequate space for maintenance needs?
Front 42 in (106 cm) min., 48 in (121 cm) recommended. Rear 32 in (81 cm) min., 36 in (91cm) recommended
  

3.Is access to the site or computer room restricted?  

4.Is the computer room structurally complete?
Expected date of completion?
  

5.Is a raised floor installed and in good condition?
What is the floor to ceiling height? [7.5 ft (228 cm) minimum]
  

6.Is the raised floor adequate for equipment loading?  

7.Are there channels or cutouts for cable routing?  

8.Is there a remote console telephone line available with an RJ11 jack?  

9.Is a telephone line available?  

9a.

Is the customer aware of the iCOD email requirements?

Each bootable partition requires a connection to the internet to send email to notify Hewlett-Packard that the customer has allocated additional CPUs beyond the amount initially purchased. Each bootable partition must be configured to perform this operation.

For more details, go to http://superdome.hp.com and click on the iCOD link.

10.Are customer supplied peripheral and LAN cables available and of the proper type?  

11.

Are floor tiles in good condition and properly braced?

12.

Metallic particulate test required.

Power and lighting
No.Area or conditionYesNo

13.Are lighting levels adequate for maintenance?  

14.Are there ac outlets available for servicing needs? (i.e. vacuuming)  

15.Does the input voltage correspond to equipment specifications?  

15A

Is dual source power used? If so, identify type(s) and evaluate grounding.

16Does the input frequency correspond to equipment specifications?  

17.Are lightning arrestors installed inside the building?  

18.Is power conditioning equipment installed?  

19.Is there a dedicated branch circuit for equipment?  

20.Is the dedicated branch circuit less than 250 feet (72.5 meters)?  

21.Are the input circuit breakers adequate for equipment loads?  

Safety
No.Area or conditionYesNo

22.Is there an emergency power shut-off switch?  

23.Is there a telephone available for emergency purposes?  

24.Is there a fire protection system in the computer room?  

25.Is antistatic flooring installed?  

26.Are there any equipment servicing hazards
(loose ground wires, poor lighting, etc.)?
  

Cooling
No.Area or conditionYesNo

27.Can cooling be maintained between 68° and 77° (20° and 25° C)?  

28.Can temperature changes be held to 9° (5 ° C) per hour?  

29.Can humidity level be maintained between 40% and 55%?  

30.Are air conditioning filters installed and clean?  

Storage
No.Area or conditionYesNo

31.Are cabinets available for tape and disc media?  

32.Is shelving available for documentation?  

Training

No.

Area or Condition  

33

Are personnel enrolled in the System Administrator’s Course?  

34

Is on-site training required?  

 

Printable version
Privacy statement Using this site means you accept its terms Feedback to webmaster
© Hewlett-Packard Development Company, L.P.