Jump to content United States-English
HP.com Home Products and Services Support and Drivers Solutions How to Buy
» Contact HP
More options
HP.com home
HP J3420B HP-HSC ATM/155 Adapter for Industrial Workstations Installation Guide: HP 9000 Networking > Chapter 2  Installing the HP-HSC ATM/155 Adapter

Verifying Hardware Installation

» 

Technical documentation

Complete book in PDF
» Feedback
Content starts here

 » Table of Contents

To verify that you have correctly installed the HP-HSC ATM/155 adapter, follow these steps:

  1. Look at the Carrier LED on the ATM adapter. A green light means that the hardware installation was successful and that the ATM cables are correctly connected.

  2. If the LED is not green, do the following things:

    1. Ensure that the system and the ATM switch are powered on.

    2. Swap (with each other) the transmit and receive cables connected to the ATM adapter.

  3. If the LED is still not green, see the ATM Configuration and Troubleshooting Guide for troubleshooting information.

Printable version
Privacy statement Using this site means you accept its terms Feedback to webmaster
© 1999 Hewlett-Packard Development Company, L.P.