| United States-English |
|
|
|
![]() |
hp Carrier Grade Blade Server bh3710 Installation Guide > Chapter 4 Applying Power to the hp Blade Server bh3710Blade Server Power-Down |
|
Power-down procedures apply to the rp2200 and management server blades. The chassis (blade server) is powered down only after all server blades are shut off. Orderly power-down of the blade server requires that the bp2200 blade be powered-off first, then the Management blade. The following steps apply for powering-down both systems:
The blade server is designed to run continuously. Under normal conditions, only the bp2200 and management server blades, both of which are hot-swappable, will be powered-off and on.
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||